A Guide To Install Bus Bar Riser And Shop Drawing

From MMA Tycoon Help
Jump to navigation Jump to search


Busbar risers are necessary if you want to install double-sided busbars on your industrial equipment. It is more preferable than buying new distribution boards or single-sided ones, because it helps you make a cost-efficient decision as you can control the tension and movement of the equipment. If you are not an expert when it comes to this, you should hire someone who is. You should know that the installation of this equipment is not something difficult. However, you should know how to install it properly so that it will serve its purpose and you will not have any problems later on.


First, you need to get your hands on two boxes. One is the one with the pipe attachments and the other is the electrical box with mounting brackets. Get started by installing the pipe attachments to the two holes. You should then mount the cable drums on the bottom part of the drum with the help of the air-handling units. You will also have to mount the electrical hookup in the top of the bracket.


Next, mount the alarm panel to the air-handling units. The cable hooks will be connected to the alarm panel and the wire hooks to the air-conditioning system. Now you should read your manual carefully so that you will know what each of these components does. Mount all the cable drums, cables, air-conditioning units and the alarm panel to the same location. Now turn off the power to the system and disconnect the alarm system.


Install a lightning protection system. Lightning protection for an air-conditioning and cooling system is essential so that you will not have any problem when the system is being operated. Do not install the cable hooks in locations where electrical cables run. Do not forget to include this step in your checklist. It will save you a lot of trouble.


Turn off the power and disconnect the alarm system. You must supervise and complete the installation of the busbar riser. If you are doing it on your own, make sure that you know exactly how to install the device. Make sure that you do not install the device in a way that it may cause any injury or accident. Always supervise and complete the task of installing the main board.


You must also supervise and complete the task of connecting the bus and the substation. Connect the bus to the main electrical site through the existing duct bank. You should also connect the substation to the electrical site through the existing duct bank. When you are connecting the duct banks, make sure that you connect the entire system to the main electrical site through the existing ducts.


The next step is to draw the shop drawing of the system. The shop drawing will give you complete details of the bus, the mounting, and the electrical connections. You can easily get a detailed drawing of the entire system by using the appropriate software. Draw the shop drawing on the paper of the appropriate format of the electrical company.


You should then carefully read the whole manual of the system for any possible instructions. After studying the manual, you should cut the sheet of wood and the PVC pipes with the help of a utility knife. You should then start with cutting the pipe of the double-ended double-armed pump room. You should then disconnect the switches, the valve box, and the emergency stops. You should then cut the sheet of wood and PVC pipes with the help of a utility knife. You should then start with the installation of the bus and the pedestal for the distribution boards.